Construction Terms (Non-Contestable & Contestable) 3302
This Contract sets out the terms upon which SA Power Networks will establish a Connection or alter an existing Connection between the Distribution Network and the Supply Address
This Contract sets out the terms upon which SA Power Networks will establish a Connection or alter an existing Connection between the Distribution Network and the Supply Address
-
External contractors contact list
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
This document provides the contact list of external contracting companies (ie Designers/ Consultants, Electrical and Civil), which are listed by SA Power Networks, who may be able to undertake a range of services associated with the installation of the electrical infrastructure, but the list does not necessarily reflect all of the contracting companies that have suitable accreditation.
-
Distribution Annual Planning Report 2023/24 to 2027/28
The Distribution Annual Planning Report has been prepared by SA Power Networks to inform National Electricity Market (NEM) regulators, participants and stakeholders about existing and forecast system limitations on our distribution network, and where and when they are expected to arise within the forward planning period from 2023/24 to 2027/28 and whether the AER's Regulatory Investment Test for Distribution (RIT-D) process applies.
The Distribution Annual Planning Report has been prepared by SA Power Networks to inform National Electricity Market (NEM) regulators, participants and stakeholders about existing and forecast system limitations on our distribution network, and where and when they are expected to arise within the forward planning period from 2023/24 to 2027/28 and whether the AER's Regulatory Investment Test for Distribution (RIT-D) process applies.
-
Network Information for Customers and Contractors NICC-404-Working in the Vicinity of SA Power Networks Infrastructure - Network Access Permit Process
This document sets out the requirements for third parties performing works within vicinity to SA Power Networks infrastructure, including the Network Access Permit request process and the safe working methods and clearances.
This document sets out the requirements for third parties performing works within vicinity to SA Power Networks infrastructure, including the Network Access Permit request process and the safe working methods and clearances.
-
Excluded substations statement
In accordance with clause 5.13A(b)(2) of the National Electricity Rules, SA Power Networks is required to disclose those zone substations which have been excluded from its zone substation dataset on the basis of confidentiality.
In accordance with clause 5.13A(b)(2) of the National Electricity Rules, SA Power Networks is required to disclose those zone substations which have been excluded from its zone substation dataset on the basis of confidentiality.
-
TS132 F1 - MEG Commissioning Witnessing Checklist
This document is a witnessing and commissioning checklist for Medium Embedded Generation (above 30kVA to 500kVA) units only.
This document is a witnessing and commissioning checklist for Medium Embedded Generation (above 30kVA to 500kVA) units only.
-
TS132 F2 - LEG Commissioning Witnessing Checklist
Sections within this document that have table headings that are highlighted blue, must be filled out and completed by the Customer, section table headings that are in orange will be filled out by the SA Power Networks Witnesser on the day. Please provide along with your Commissioning Plan a brief description of the method you intend to use to demonstrate each of the settings within it. This will assist should there be insufficient radiance for example on a PV system on the day of commissioning, being able to modify to suit conditions.
Sections within this document that have table headings that are highlighted blue, must be filled out and completed by the Customer, section table headings that are in orange will be filled out by the SA Power Networks Witnesser on the day. Please provide along with your Commissioning Plan a brief description of the method you intend to use to demonstrate each of the settings within it. This will assist should there be insufficient radiance for example on a PV system on the day of commissioning, being able to modify to suit conditions.
-
Final Project Assessment Report (FPAR) - Addressing Network Constraints on the Southern Outer Metro 66kV Loop
The Southern Outer Metro 66kV Loop Final Project Assessment Report (FPAR) has been prepared in accordance with and is limited to the requirements of Clause 5.17.4 of the National Electricity Rules for the purpose of publicly announcing the provisional outcome of SA Power Networks evaluation of options in response to a specific set of identified needs.
The Southern Outer Metro 66kV Loop Final Project Assessment Report (FPAR) has been prepared in accordance with and is limited to the requirements of Clause 5.17.4 of the National Electricity Rules for the purpose of publicly announcing the provisional outcome of SA Power Networks evaluation of options in response to a specific set of identified needs.
-
Technical standard TS-101 - Public Lighting - Design and Installation
This document specifies the public lighting standards, including flood lighting, which are either new and/or upgraded installations that will be a connected to SA Power Networks distribution network.
This document specifies the public lighting standards, including flood lighting, which are either new and/or upgraded installations that will be a connected to SA Power Networks distribution network.