Helicopter inspections provide a bird’s eye view of the network to identify any obvious faults or potential defects we might miss from the ground. Not all inspections can be done by helicopter and will be patrolled from the ground if required.

Aerial patrols also form part of our annual maintenance program to inspect our powerlines and other assets in bushfire risk areas. We do this to ensure our network is safe and reliable, and meets the higher demand for power in the warmer months.

Risks we look for include:

  • vegetation close to powerlines
  • birds’ nests
  • low hanging powerlines
  • damaged equipment.
     

Using a helicopter also reduces the impact on properties as there’s no need to drive through paddocks or crops. We recommend moving livestock from paddocks with powerlines when we’re doing inspections in your area, as the helicopter may hover at low heights.


Dates of powerline inspections by helicopter

We conduct aerial inspections of powerlines across different regions of South Australia according to the schedule below. Powerline inspections via helicopter typically start from mid-May and will be completed prior to the start of the CFS fire danger season dates. Please note that dates are approximate and are subject to change.

See a map and indicative schedule for 2024 inspection dates in your region below.

SA Power Networks aerial inspection map 2024 showing Pre-Bushfire Patrols prior to the start of the Country Fire Service (CFS) declared Fire Danger Season.

Eyre and Upper North 

District Date*
Ceduna 6 May - 19 May
Cleve 27 May - 16 June
Cummins 10 June - 23 June
Hawker 10 June - 16 June
Port Augusta  10 June - 16 June
Port Lincoln  24 June - 30 June
Streaky Bay  13 May - 26 May
Wudinna  13 May - 9 June

 

Fleurieu and Barossa

District Date*
Gawler 15 July - 28 July
Kangaroo Island 30 September - 11 October
Mclaren Vale 14 October - 27 October
Nuriootpa 29 July - 11 August
Strathalbyn 30 September - 13 October
Victor Harbor 14 October - 27 October

 

Hills and Metro

District Date*
Gumeracha 7 October - 13 October
Metro 33/66kv 7 October - 13 October
Mount Barker 7 October - 13 October
Noarlunga 7 October - 13 October

 

Mid North

District Date*
Burra 26 August - 8 September
Clare 12 August - 1 September
Gladstone 24 June - 14 July
Kadina 12 August - 8 September
Maitland 2 September - 15 September
Port Pirie 17 June - 23 June
Riverton 2 September - 29 September
Yorketown 9 September - 29 September

 

Murrayland

District Date*
Coonalpyn 2 September - 22 September
Lameroo 16 September - 6 October
Mannum 12 August - 1 September
Murray Bridge 5 August - 25 August 

 

Riverland

District Date*
Barmera 15 July - 21 July
Loxton 15 July - 4 August
Waikerie 29 July - 11 August

 

South East

District Date*
Bordertown 8 July - 4 August
Millicent 3 June - 16 June
Mount Gambier 20 May - 2 June
Naracoorte 17 June - 7 July

 

* Dates are subject to change.

Not all inspections can be done by helicopter and some areas will be patrolled from the ground if required. We may need access to your property in some instances.

 

Other ways we inspect powerlines

Powerline inspections by aerial drones